Applying to the DNO for an EV charger?
Check the supply first, free, in about a minute.
Not sure what to enter? Email us the job details and we'll run the check for you.
No email or MPAN needed for the free colour result.
Site Supply Details
Phase and fuse rating only for the free check. Postcode and MPAN come later if you order the report.
Not sure? It's printed on the fuse carrier in the cut-out, often 60, 80 or 100 A. The carrier label isn't always the fuse inside, so your DNO can confirm it.
From your connection agreement or electricity bill (sometimes called Maximum Import Capacity or Agreed Supply Capacity). kVA is converted to amps per phase at 230 V. If you leave it blank, we use the cut-out fuse rating, assumed and to be confirmed with the DNO.
A free green, amber or red supply result that shows whether the job is likely to need a DNO notification or an application, and an optional £49 PDF feasibility report based on EREC G100 to support it.
- Sample report (PDF)An illustrative example of the £49 feasibility report.
- What is EREC G100?How a customer limitation scheme works.
- About GridcapSupply checks for installers and property managers.
Gridcap provides the check and the report to support your own application. It does not prepare or submit the application to the DNO.